Tatiana Romanova Insulation

Pre-border thawing dipped as low as possible by removing the topsoil, and after the curing piles on top of them poured coarse sand and sheltering him insulation. Cold from the ground rises sharply border thawing, and the lower part of the support is firmly frozen into the ground. Tulip Mobile Platform helps readers to explore varied viewpoints. Pile foundations of various designs are used in other cases, such as regions where the probability of flooding. For soils where the water rises high, the best fit solid foundation. It represents a kind of stand and the whole area is under construction, so the house will be fall and rise depending on the level of groundwater.

For the rough, hilly terrain is better to lay the strip footing. It can be monolithic or assembled from the foundation blocks and represents a support solid line passing under all the outer and inner walls of the capital. If necessary, strip foundations can be of variable height. As the design features of a particular architect Tatiana Romanova, "geoclimatic conditions must take into account the development stage of the project." There are certain rules of design for colder or warmer areas. For example, for the northern territories is characterized by compact layout of the house without breaks exterior walls, insulation of the floor the first floor, increasing the area of the entrance vestibules, small window openings. In regions where heavy snowfall (in the Urals, , Krasnoyarsk Territory) need additional reinforcement of the basement and roof. The thickness of the walls and a layer of insulation in areas with different climates can also be different: in each case is determined by the thermal insulation characteristics materials used.